  • Gutter Replacement and Leaf Guards on All Buildings
    • Full replacement and leaf‑guard installation to prevent clogging and reduce water damage.

  • Roof Replacement & Corresponding Repairs (Buildings 329 & 361)
    • New roofing, replacement and repair of fascia wood and rafter tips, and associated structural/flashing work to extend service life and prevent water intrusion.

  • Paving of Common Loop & Exit to Orkney Grade
    • Resurfaced community loop and exit to Orkney Grade for improved drainage, smoother driving, safer walking, and enhanced curb appeal.

  • Crawlspace Encapsulation (Building 361)
    • Crawlspace moisture control and air‑sealing completed to protect the building envelope, reduce long‑term maintenance, and prevent water pipes from freezing and bursting in winter.

  • Insulation Repairs (Buildings 248, 274, & 329)
    • Targeted insulation fixes to improve energy efficiency and occupant comfort.

  • Repair and Replacement of Gable Fans
    • Replaced and reconfigured gable fans and set correct operating parameters for crawlspaces to prevent mold and pest problems, protecting structural integrity.

  • Replacement of Breezeway Hangers
    • Replaced severely rusted breezeway hangers (for Stack 12) that created safety hazards to restore secure support and reduce liability. Additional breezeways' hangers are in desperate need of imminent repair.

  • Replacement of Dumpster for Buildings 248, 274, & 329
    • New, more durable dumpster unit and enclosure for improved sanitation and curb appeal.

  • Reinstated Monthly Maintenance Inspections
    • Regular inspection cadence restored to proactively identify and address issues.

  • Lighting Repair and Replacement
    • Upgraded and repaired exterior lighting for improved safety and nighttime visibility.

  • Leaf and Debris Clearing (Blowing) for Common Areas
    • Implemented regular leaf‑blowing for breezeways, stairwells, patios, driveways, and parking spaces to remove slip and fire hazards and improve curb appeal.

  • Established Quarterly Coordination Meetings with Other HOAs on The Hill
    • Established quarterly meetings with neighboring HOAs to pursue joint contracting and bulk purchasing opportunities to reduce costs through economies of scale. One example includes the Common Loop paving.

  • Electrical Panel Inspections and Outlet Replacements
    • Performed inspections of electrical panels (breaker boxes) and replaced faulty electrical outlets to ensure safe operation.

  • Chimney Cleaning
    • Cleaned wood burning chimneys to remove creosote and debris, improving safety and reducing fire risk.

  • Wood Inspection and Repair Plan
    • Completed a detailed wood inspection with a wood-specialist contractor and developed a prioritized plan for wood repairs to siding, decks, breezeways, and stairwells.

  • Informational Website Built
    • Launched the community informational website to centralize notices, contacts, project updates, and resources for residents.

  • Reserve Study